What is your process of roof inspection?

A thorough inspection could take 1 to 2 hours. We visit the site first to inspect the roof and then provide a print out of the detailed estimate. Roof inspectors and cost estimators in our team are usually booked out at least 8 to 10 days for providing new estimates.

May 28
Featured image for AccuSeal blog

How long will it take to get a new roof?

Project completion time is dependent on the size, shape, pitch and complexity of your roof. Small to medium size roofs usually take 1 to 3 days. Larger projects can take more than a week.

May 28
Featured image for AccuSeal blog

What are the common signs of roof damage?

Some of the signs of roof system problems are: – Warped, cracked or missing shingles; deteriorated or disintegrated flashings; loose seams; excessive surface granules clustered in the downspouts or gutters. Usually, roofing problems are discovered after visible damage has occurred from a leak.